تفاصيل المنتج
مكان المنشأ: الصين
اسم العلامة التجارية: Long Xin
رقم الموديل: مصنوع بطريقة مخصصة
شروط الدفع والشحن
الحد الأدنى لكمية: 200 م²
الأسعار: قابل للتفاوض
تفاصيل التغليف: البليت الصلب
وقت التسليم: 30-55 يوما
شروط الدفع: تي / تي، د / ف
القدرة على العرض: 15000 طن شهريا
|
اسم:
|
مباني فولاذية مسبقة الصنع
|
مادة:
|
فُولاَذ
|
مقاس:
|
قابلة للتخصيص
|
الكلمات الرئيسية:
|
مبنى تجاري ذو هيكل فولاذي
|
عمر:
|
50 سنة
|
|
اسم:
|
مباني فولاذية مسبقة الصنع
|
|
مادة:
|
فُولاَذ
|
|
مقاس:
|
قابلة للتخصيص
|
|
الكلمات الرئيسية:
|
مبنى تجاري ذو هيكل فولاذي
|
|
عمر:
|
50 سنة
|
Product Description
As a leading example of modern construction technology, steel-structured commercial buildings utilize high-strength steel (Q355B and above, with a yield strength of 355MPa) for their primary framework, ensuring safety against Category 12 typhoons and 8-degree seismic fortification. Their innovative "column-free large-space" design combines H-shaped steel columns (typical dimensions 300×300mm) with open-web trusses to create spans of 15-30 meters, increasing usable area by 25%-35% compared to traditional concrete structures—ideal for warehouse logistics, convention centers, and other space-intensive applications. Relying on BIM collaborative design and industrialized construction systems, these buildings achieve over 85% factory prefabrication rates, reducing on-site assembly time by 50%-70% compared to conventional methods while lowering initial construction costs by 15%-20% (China Steel Structure Association 2024 data).
Product Parameter
| ltem | Specification | |
| Main Frame | Steel column | Q355B welded H section steel/hot-rolled H section steel |
| Steel beam | Q355B welded H section steel/hot-rolled H section steel | |
| Steel decking floor | V688 section | |
| Steel purlin | C/Z section purlin or square tube column | |
| Wall Part | Wall panel and framework | PVDF,PU,75mm Rock Wool |
| Glass curtain wall and framework | 6+12+6 Tempered insulating glass | |
| Canopy | 6+1.14PVB+6 Tempered laminated glass | |
| Downpipe | PUC | |
| op cover | Aluminium plate | |
| Window cover | PVDF | |
| Self-tapping screw | M6.3 | |
| Gutter | Stainless steel gutter/UPVC gutter | |
| Standard Part | High strength bolt | M20 |
| Galvanized bolt | M12 | |
| M24 nut | M24 | |
| Accessories | Rivet,sealant,etc | |
| Others | Door | Aluminium door |
| Window | Aluminium window |
1. Steel structure commercial building is built over three members connected to each other by bolts and screws: Primary members.
Steel columns will be H section steel, square tube steel according to different type of buildings.
Steel beams are usually H section steel.
2. Secondary members (C or Z purlins, bracing...)
3. Roof and wall sheeting or sandwich panel (EPS, fiberglass wool, PU sandwich panel) Other building components (Rolling doors, aluminium windows, etc.)
4. The entire primary members and secondary members are designed and fully fabricated including cut-to-length, punching, drilling, welding and performing in the factory before shipping to the site for erection. At the site, all components are assembled and jointed via nut & bolt connections; thereby reducing the costs and assembly times.
5. These buildings can be provided with different structural and non-structural additions such as ventilators, doors & windows, trusses, mezzanine floors, canopies, crane, insulation…, based on the customer's requirements.
Quote
If you already have the project drawings, please send to us, we will directly quote for you.
1. Project location;
2. Dimension (length*width*eave height);
3. There is mezzanine or not? How many kgs will be loaded per square meter on mezzanine if have?
4. Steel sheet or sandwich panel roof and wall;
5. Snow load if applicable;
6. Any other particular requirements?
![]()
Products Cases
Compared with traditional concrete buildings, steel structure commercial buildings use steel plates or section steel to replace reinforced concrete, which is stronger and more resistant to earthquakes. And because the component can be factory made, site installation, thus greatly reducing the construction period. Due to the reusable steel, it can be greatly reduced the construction waste, and more green environmental protection, so it is widely used in industrial buildings and civil buildings over the world.
If you want a building that has cost saving, fast erection, good quality control, high durability, steel structure buildings will be the best choice.
As the latest trend in building construction, steel structure buildings increasingly confirmed their outstanding advantages in agricultural, industrial and commercial projects such as workshop, warehouse, workshop, factory, storage, showroom, office building, supermarket, school, stadium, logistics center, etc…
![]()
FAQ
1. Are you trading company or manufacturer ?
We have our own steel structure, steel sheet and sandwich panel manufacturing factories. Welcome to our company to see our products and discuss your project.
2. Can you provide on-site installation service?
We can provide Installation guide service based on customers’ request. The shop drawing, installation drawing and video will send to client to help the site erection. If need, our engineer will come to site to guide the installation.
3. What is the delivery time?
It depends on the quantities of order. Generally, the delivery time will be within 30 to 55 days.
4. How can I get a quotation for my project?
Pls no hesitate to send me message here or Email me. I will reply to you ASAP. Welcome to contact me for your building!
5. What about packaging and shipping?
The package of steel structure material is steel pallet. After loading into the containers, they will be sent to the Shanghai Port and transported by Sea.